Case Study

Toho Gas LNG Terminal Station

  • Major natural gas utility in Japan
  • 125kW & 300kW systems installed at LNG terminal station
  • Commissioning completed
  • Five-year follow-on installation forecast ≈ 75 systems

Terminal Station
Facility
125 and 300 kW FITS
125 and 300 kW FITS
Variable Speed Drives
Brake Resistors

Application Form

Application InformationValueNote
Location NameToho Gas LNG Terminal in Nagoya, JapanFor reference.
Process GasNatural Gase.g., hydrogen, natural gas, nitrogen.
Turboexpander ConditionsValueUnitNote
Inlet Temperature (T1)45 (113)deg C (deg F)Temperature of inlet gas (after boiler / HEX). C, F, K.
Inlet Pressure (P1)20 (290)bar-g (psi-g)Pressure of inlet gas (after boiler / HEX). atm-g, bar-g, Pa-g, psi-g.
Volumetric Flow Rate28,000 (17,400)Nm3/hr (SCF/min)Provide average or range. SCF/period @ 60-F & 1-atm, Sm3/period @ 20-C & 1-atm, Nm3/period @ 0-C & 1-atm.
Minimum Permitted Outlet Temperature (T2) 2 (36)deg C (deg F)Temperature of outlet (low pressure) gas (after PCV / turboexpander). C, F, K.
Outlet Pressure (P2)8 (116)bar-g (psi-g)Pressure of outlet (low pressure) gas (after PCV / turboexpander). atm-g, bar-g, Pa-g, psi-g.
Capacity Factor (Uptime)85%Average process uptime during representative period.
Economic ParametersValueUnitNote (Confirm rate type)
Electricity Rate0.16US$/kWh ☐ Retail rate (power to be consumed locally).
☒ Sell-back rate (power to be sold to utility).

Economics & Carbon savings

Wholesale Electricity Rate = $0.16/kWh*

For a 300kW FIT installation :

  • 2-yr, 3-mo Payback on capex
  • 1,750-ton/yr CO2e savings**

* Prices are estimates for purpose of this presentation
** From United States EPA’s Greenhouse Gas Equivalencies Calculator